Almost every renovation starts with taking things out. In Istria that often means more than expected: two layers of tiles on top of each other, a bathroom from the 1980s, a kitchen nobody wants, and a konoba full of old furniture left by the previous owners. Demolition is hard, dusty work, and getting rid of the waste properly is half the job. We put you in touch with people from our network who do both.
What the work includes
- Interior strip-outs. Removing old tiles, bathroom fittings, kitchens, floor coverings, plasterboard and suspended ceilings.
- Non-load-bearing walls. Taking out partitions to open up a room, once it is clear that the wall carries no load.
- Rubble removal. Loading and taking away rubble, tiles, plaster and other construction waste, by van or with a skip where there is space.
- Bulky waste. Old furniture, mattresses, appliances and everything else left in a house you have just bought.
- Carrying heavy items. Getting heavy or awkward things out of narrow stairways and old-town houses.
How construction waste and bulky waste are handled in Istria, and what a skip involves, is explained in our guide to demolition and waste disposal in Istria. If you are looking at a run-down property, also read buying a ruin in Istria: clearing it is often the first real cost.

Safety first
Before a wall comes down, it has to be clear whether it carries load. If there is any doubt, a structural engineer should look at it, and some changes may need a permit, depending on the building and the municipality; see our general guide to renovation permits in Croatia. Some older buildings have roofing or pipes made with asbestos cement. If asbestos is suspected, the work stops and you are told: that material has to be handled by a specialised company, not by a general demolition crew.
How it works when you are abroad
- Send photos or a video of what has to go, on WhatsApp or through the request form, and tell us about access: stairs, distance from the road, parking.
- We put you in touch with a crew from our network, who give you a rough range for the demolition and the waste removal.
- You agree a date with them, and if necessary a skip or more trips with the van.
- You receive photos of the empty, cleared space, ready for the next trade.
What affects the price
The amount and type of material, how hard it is to remove (tiles on concrete take longer than tiles on plaster), how far the waste has to be carried, and access for a van or skip. Old towns like Rovinj/Rovigno, Poreč/Parenzo or Motovun/Montona, with narrow lanes and stairs, take more time than a house with a driveway. Disposal costs depend on the type and quantity of waste. For a first estimate of a whole project, try the free renovation cost calculator.
Demolition is usually the first step of a renovation or a bathroom renovation. If you are also moving furniture between houses, see our moving and transport service, and for clearing overgrown land around the house, garden care.
Describe what needs to go in the free request form or send photos on WhatsApp. We will put you in touch with a vetted crew from our network, free for you.
Frequently asked questions
Can an old bathroom be taken out and the room left ready for renovation?
Yes. The crew removes tiles, fittings and old pipes where needed, takes the rubble away and leaves the room ready for the next trades.
Can old furniture and bulky waste be taken away?
Yes. Old furniture, mattresses, appliances and other bulky waste can be cleared from a house or apartment and disposed of properly.
Can a wall be removed?
Non-load-bearing walls, yes. If there is any doubt about whether a wall carries load, a structural engineer should check it first, and some changes may need a permit.
What about asbestos?
If asbestos is suspected, for example in old roof sheets or pipes, the work stops and you are told. It has to be removed by a specialised company.
